× Search
Menu

Development works

as at 1 July 2018

Resource consent and building consent application Charges

Applications lodged without an electronic version (applies to professional service providers only)

  • a hardcopy of all plans and documentation must accompany the application
  • the electronic version and hardcopy plans and documentation of the development works / engineering component of the application must comply with the Infrastructure Development Code (IDC).
$150.00

Initial deposit only with either refund or additional charge as appropriate - actual costs will be charged

(Note: actual costs will be calculated at time of Section 223/224 application)
 
Development works approval Charges
Project value less than $10K $1,500.00
Project value between $10K and $100K $1,500 plus 1.5% of the value of the development works and professional
fees
Project value greater than $100K $3,500 plus 0.7% of the value of the develop-
ment works and professional
fees

 

CCTV Inspections of gravity drainage lines Charges
CCTV Inspections and/or reinspections Developer cost
CCTV technical review and data conversion (approximately $2.00 per metre) Actual costs charged

 

Other fees  

Out-of-sequence Building Consent Application - using AC7 process (Application for Land Development Engineering sign-off before new title is issued using “parent” title)

(Lump sum fee per application)
$190.00
Geotechnical Peer Reviews Actual Cost plus 10% administration
fee
Geo-professional Category 1 or 2 pre-Qualification  
Application for Category 1 or 2 accreditation $1,500.00
Application for renewal - continuance at same level $600.00
Subdivision Reserves, Stormwater Reserves and streetscape Maintenance fee (in Lieu of developer miantenance)  
Type 7 Mowing - Grass Height 30mm-60mm $0.086
(8.65cents)/m²/
month
Type 8 Mowing - Grass Height 30mm-100mm $0.034 (3.4
cents)/m²/
month
G2 Gardens $0.3143
(31.4 cents)/
m²/month
G3 Gardens $0.1599 (15.9
cents)/m²/
month
G4 Gardens $0.0851 (8.5
cents)/m²/
month
H1 Hedges - below 600mm high $1.0299 ($1.03
dollars)/LM/
month
H2 Hedges - below 1800mm high $0.8829 (88.2
cents)/LM/
month
E1 Reveg - year 0-2 $0.27 (27
cents)/m²/
month
E2 Reveg - year 2-4 $0.18 (18
cents)/m²/
month
E3 Reveg - year 4-6 $0.0313 (3
cents)/m²/
month
E4 Reveg - over mature site $0.065 (6.5
cents)/m²/
month
Tree Maintenance $76.00/tree/
year
Bonds (See Infrastructure Development Code Section QA7) Charges
Minimum bond amount is $5,000.00  
Administration fee (non-refundable) $275.00
Potentially Refundable Components Charges
Landscape maintenance bond Cost plus 25% contingency plus GST
Incomplete works bond Cost plus 25% contingency plus GST
As-Built information received in paper form Charges
Base fee $190.00
Cost per allotment $100.00
Electronic Conversion fee - applied per allotment when a PDF of the as-built information is not provided with the paper record as-builts $75.00
As-Built Information received in electronic form Charges
Base fee $190.00
Cost per allotment $60.00
Digital Conversion Fee - applied per allotment when a PDF of the as-built information is not provided with the electronic record as-builts $75.00
As-Built Information received in paper form - 2 lot subdivision only Charges
Fixed fee $270.00

Last Reviewed: 18/07/2018
 

 
Please enter the code shown
Enter the code shown above in the box below.
 

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand   |  Terms of use   |  Site map

Back To Top