Development works

Resource consent and building consent application Charges

Applications lodged without an electronic version (applies to professional service providers only)

  • a hardcopy of all plans and documentation must accompany the application
  • the electronic version and hardcopy plans and documentation of the development works / engineering component of the application must comply with the Infrastructure Development Code (IDC).
$129.00

Development works approvals, observation/testing and inspections

Notes:

  1. Deposit Fees:
    The fees outlined below are a non-refundable deposit fee for development works approval and the subsequent observation/testing and monitoring of the construction of the works associated with the development works approval.
    The costs associated with the approving, observation/testing and monitoring of the developmentworks will be deducted from the deposit fees listed below. Where the costs incurred exceed the deposit fee then the consent holder will be invoiced for the outstanding balance.
    All costs associated with the approving, observation/testing and monitoring of the development works are accrued on a time and cost basis.
    A minimum charge of one hour plus disbursements will be applied per observation or attendance. Where the observation or attendance exceeds one hour, then the balance time will be charged on a time/cost basis.
  2. Periodic Observations:
    All projects valued at $10,000 plus are periodically observed, typically weekly during their construction. The observation inspection will be charged on a time and cost basis. A minimum charge of one hour plus disbursements will be applied per inspection. Where the inspection time exceeds one hour, then the balance time will be charged on a time/cost basis.
  3. Reinspections:
    Where development works fail a formal observation/test, then the subsequent cost of reinspection will be charged to the consentholder additional to the above deposit fee. A minimum charge of one hour plus disbursements will be applied per reinspection/test or attendance. Where the reinspection or attendance exceeds one hour, then the balance of time will be charged on a time/cost basis.
  4. Payment of Fee:
    The development works deposit fee must be paid at the time of applying for the development works approval. Where the cost of the approval process, observation/testing and monitoring of the development works exceeds the deposit fee, then the balance shall be paid prior to the release of the s224 certificate.
  5. CCTV Inspections
    See the notes below relating to CCTV inspections
Development Works approval Charges
Bond processing fee
Applied to each bond type being requested. Where the cost to administer the bond exceeds the fee, then actual cost will be charged on a time and cost basis
$248.00
Development Works Fee Actual time
and cost
Minor works where value of works $x < $10,000 $326.00
Works where: $10,000 < $x < $100,000 $326 plus 
1.5% of the
value of the
development
works
Works where: $x > $100,000 $1,791 plus
0.7% of the 
value of the
development
works
Development Works observation/testing (see notes adjacent) 1 hour
minimum plus
disbursements
Reinspections (see notes adjacent) 1 hour
minimum plus
disbursements
Periodic monitoring observation (see notes adjacent) 1 hour
minimum plus
disbursements
CCTV Inspections of development constructed stormwater and wastewater pipelines Charges
CCTV Inspections and/or reinspections No council
contribution
CCTV technical review and data conversion 100% cost
recovery
(Approximately
$1.60 per
metre)
Research/Retrieval of Information from files by Administration or professional staff (Actual cost
with minimum
charge for first
hour or part
thereof plus
disbursements.
Thereafter on
an actual cost
basis).
Geotechnical Peer Reviews Actual Cost
plus 10%
administration
fee
Geotechnical Pre-Qualification $1,000.00
Subdivision Reserves, Stormwater Reserves and Streetscape Maintenance Fee (in Lieu of Developer Maintenance) Charges
Type 7 Mowing - Grass Height 30mm-60mm $0.086
(8.65cents)/m²/
month
Type 8 Mowing - Grass Height 30mm-100mm $0.034 (3.4
cents)/m²/
month
G2 Gardens $0.3143
(31.4 cents)/
m²/month
G3 Gardens $0.1599 (15.9
cents)/m²/
month
G4 Gardens $0.0851 (8.5
cents)/m²/
month
H1 Hedges - below 600mm high $1.0299 ($1.03
dollars)/LM/
month
H2 Hedges - below 1800mm high $0.8829 (88.2
cents)/LM/
month
E1 Reveg - year 0-2 $0.27 (27
cents)/m²/
month
E2 Reveg - year 2-4 $0.18 (18
cents)/m²/
month
E3 Reveg - year 4-6 $0.0313 (3
cents)/m²/
month
E4 Reveg - over mature site $0.065 (6.5
cents)/m²/
month
Tree Maintenance $76.00/tree/
year

Incomplete Works Bond for Planting

Developer to provide a quote from the contractor that would be conducting the work (e.g. supplying and planting trees and
plants, root guard, mulch, etc.)
TCC Staff to accept the quote or ask for clarification.

Administration fee $248.00
plus 25%
contigency
plus 15% GST

As-Built Information Fees

These fees cover costs arising from processing of as-built information, others reports and documentation received by Council in relation to development works.

The fees below are non-refundable deposits and when required for the following will be charged on a time and cost basis.

  • Reception of, checking, data error repair, storage and display of all as-built information
  • Reception of, checking, storage and display of survey benchmarks.
  • Reception of, collation, storage and display of technical information relating to technical reports, land features, etc.
  • Street naming and numbering process

Note: The Infrastructure Development Code (IDC) details the standards and templates required to be complied with when transferring all data and information to the City. As well as transfer of data via electronic means a .PDF version of the completed as-built plans is required as a final construction record for the development.

Incorrect As-built Information

When as-built information provided to Council is not in the required formats or found to contain incorrect information (i.e. incorrect service connections, data, dimensions, co-ordinates, references or does not match what is observed out in the field), the information may be declined or, in some cases, Council will charge the Consultant responsible for the costs incurred in following up the incorrect information, co-ordinating the finding of incorrect as-built information and/or undertaking the repair or conversion of data to the correct format itself.

(Actual cost with minimum charge for first hour or part thereof plus disbursements. Thereafter on an actual cost basis)

Note: Where incorrect as-built information is found by Council and the Consultant concerned does not assist in rectifying the incorrect as-built information or finding the incorrectly shown service connections, then Council will no longer accept as-built information from this Consultant.

Actual
cost with a
minimum
charge of one
hour plus
disbursements.
Thereafter
on an actual
cost basis
As-Built Information received in paper form Charges
Base fee $180.00
Cost per allotment $95.00
Electronic Conversion fee - applied per allotment when a PDF of the as-built information is not provided with the paper record as-builts $53.00
As-Built Information received in electronic form Charges
Base fee $180.00
Cost per allotment $58.00
Electronic Conversion Fee - applied per allotment when a PDF of the as-built information is not provided with the electronic record as-builts $53.00
As-Built Information received in paper form - 2 lot subdivision only Charges
Fixed fee $258.00

Last Reviewed: 04/07/2017
 
 

 